国产高清内射|亚洲综合熟女|午夜久久久久久久久|av在线播放不卡

 歡迎訪問濟南科爾超聲波設(shè)備有限公司網(wǎng)站!

專注生產(chǎn)工業(yè)用超聲波清洗機

讓工業(yè)清洗無難事

電話

業(yè)務(wù)咨詢電話:

18663767799

你所在位置: 首頁-新聞動態(tài)-新聞資訊低溫廢水回收設(shè)備的操作注意事項
新聞資訊

低溫廢水回收設(shè)備的操作注意事項

作者:admin來源:http://www.ww416.com/時間:2022-09-25

為了更好地使用低溫廢水回收設(shè)備,我們在使用設(shè)備時須更加注意正常運行。以下是低溫廢水回收設(shè)備的操作注意事項,小編為您解答。
In order to better use the low-temperature wastewater recovery equipment, we must pay more attention to normal operation when using the equipment. The following are the precautions for the operation of the low-temperature wastewater recovery equipment, and I will answer them for you.
1、啟動低溫廢水回收設(shè)備時檢查電路、控制柜線路接線是否正確,電壓和電流是否符合要求。
1. When starting the low-temperature wastewater recovery equipment, check whether the circuit and control cabinet wiring are correct, and whether the voltage and current meet the requirements.
2.低溫廢水回收設(shè)備的水泵采用防堵塞撕裂潛水排污泵。兩個水泵的控制由微型計算機通過檢測污水箱中的液位來完成。當液位從低到高達到工作水位時,啟動工作泵。如果液位繼續(xù)上升到警告水位,關(guān)閉工作泵,啟動風機時檢查旋轉(zhuǎn)方向是否正確,避免反轉(zhuǎn)。
2. The water pump of the low-temperature wastewater recovery equipment is a plug and tear resistant submersible sewage pump. The control of the two pumps is completed by the microcomputer through detecting the liquid level in the sewage tank. When the liquid level reaches the working water level from low to high, start the working pump. If the liquid level continues to rise to the warning water level, turn off the working pump, and check whether the rotation direction is correct when starting the fan to avoid reverse rotation.
3.當調(diào)節(jié)箱內(nèi)污水較少,且液位低于水泵啟動液位時,兩臺水泵將停止工作。此時,為使低溫廢水回收設(shè)備中的生物膜正常生長,風機將間歇啟動10分鐘,自動停止運行半小時。
3. When there is less sewage in the regulating tank and the liquid level is lower than the starting liquid level of the water pump, the two water pumps will stop working. At this time, in order to make the biofilm in the low-temperature wastewater recovery equipment grow normally, the fan will start intermittently for 10 minutes and automatically stop running for half an hour.
低溫廢水回收設(shè)備
4.沉淀池排泥控制。電磁閥通過空氣提升污泥或污泥泵提升污泥。排泥周期為8小時,排泥時間為8分鐘。當空氣被提升時,兩個風扇同時啟動,以確??諝夤?yīng)。
4. Sludge discharge control of sedimentation tank. The solenoid valve lifts the sludge through air or sludge pump. The sludge discharge cycle is 8 hours, and the sludge discharge time is 8 minutes. When the air is lifted, both fans are started at the same time to ensure the air supply.
5.風機和水泵由自動交替運行控制,交替切換時間為4小時。
5. The fan and water pump are controlled by automatic alternate operation, and the alternate switching time is 4 hours.
6、低溫廢水回收設(shè)備控制中心微機柜上按設(shè)計安排的工作程序一次完成。手動控制是通過面板上的按鍵開關(guān),手動控制潛水排污泵和風機的開關(guān)。
6. The micro cabinet of the control center of the low-temperature wastewater recovery equipment shall be completed at one time according to the designed working procedure. Manual control is to manually control the switch of submersible sewage pump and fan through the key switch on the panel.
低溫廢水回收設(shè)備的操作注意事項相關(guān)內(nèi)容便是如此了,如果您對此有什么不了解的地方,歡迎來我們網(wǎng)站www.ww416.com咨詢。
This is the case for the operation of low-temperature wastewater recovery equipment. If you have any questions about this, please visit our website at www.ww416.com.

国产高清内射|亚洲综合熟女|午夜久久久久久久久|av在线播放不卡

亚洲AV无码精品网站 | 成人99视频| 日韩色视频在线观看| 色婷婷福利导航| 9.1破解版免费版安装| 人人妻人人澡人人dvd| 欧美性猛交一久二久三久| 97精品伊人久久大香线蕉价格| 熟妇人妻久久中文字幕按摩 | 欧美射精视频| 日本亚洲高清| JIZZJIZZ日本老师水多| 男人一边吃奶一边做| 懂色av中文字幕一区二区三区| 国产精品人妻熟女a62v在线| 成年免费在线观看| 女女av在线| 国产一区二区三区精品毛片| 亚洲日本国产精品| 日本一区二区三区四区| 免费成人用力视频| 久久久嫩草| 欧美性xxxx黑人xyx性爽| 狂野欧美性猛xxxx乱大交| 久久亚洲国产精品| 国产99成人精品视频免费福利| 国产欧美一区二区三区在线| xxxx日本少妇做受| 大地第二资源第三页免费观看 | 狠狠躁日日躁xxxxaaaa| 蜜桃AV鲁一鲁一鲁一鲁樱花影院 | 久久人人爽人人爽人人片av高清| 日韩精品一区二区三区在线播放| 91精品国产综合久久久不卡| 日本熟妇北岛玲毛毛多hd | www黄色一片| 人人妻人人澡人人爽人人爱夜夜爽 | 国产日韩欧美精品一区二区| 性少妇VIDEOSEXFREEXXX片中国| 《浴室吃奶》在线播放| 花房姑娘免费大全|